Some questions have no test behind them yet. The compound is unusual, the matrix is difficult, the concentration is lower than any published method reaches, or nobody has needed to measure this particular thing before. Building the method is then the job, and it is work MS3 takes on regularly.
How a development project runs
Development is staged deliberately, so that money is committed a step at a time and you can stop at any point rather than funding an open-ended project.
- Scoping. What has to be measured, in what matrix, to what sensitivity, and what the result will be used for. This last point drives everything else.
- Feasibility. Establishing whether the measurement can be made at all with available instrumentation and chemistry, before committing to full development.
- Development. Building the method — sample preparation, separation, detection and data processing — and refining it against real samples.
- Validation. Characterising how the method actually performs: linear range, limits of detection and quantitation, precision, accuracy and recovery.
- Documentation and transfer. A written method you can hand to an auditor, and if you want to run it yourself, the support to move it into your own laboratory.
The detail
What this answersWhether the measurement you need can be made, and if so, a documented method that makes it repeatably.
What you receiveA validated, written analytical method with its performance characteristics stated, plus the data generated during development.
What we need from youA completed Analysis Request Form (PDF) sent with the samples. It asks for your contact details and a contact person, your own reference and a purchase order or quote number if you use them, and then, for each sample: your identification for it, the sample type (for example milk, powder or solid) and the test required. One form covers up to 40 samples. The laboratory records the date each sample arrived, who received it and its condition on arrival.
What it will not tell youFeasibility can conclude that a measurement is not achievable at the sensitivity you need with the chemistry and instrumentation available. That is a real and useful outcome — it is far cheaper to learn it at the feasibility stage than at the end of a full development programme — but it means a development project cannot be sold with a guaranteed result. Validation characterises how a method performs; it is not in itself a regulatory approval or an accreditation.
Scoped before it starts
The stages, the price and what each one delivers are agreed in writing before any work begins, and no stage starts on an assumption. If a project needs scoping, that conversation is with the scientist who will do the work.
